Use this kitchen remodel checklist to settle what needs deciding before work starts, so your contractor can price the real scope of work.
Layout, appliances, surfaces and the order of work all affect each other, and a change made after materials are ordered usually costs time.
Request a Free Kitchen Remodel EstimateStart with how your household cooks, cleans and stores things, because that decides what the new layout has to fix. Most kitchens work in four zones: prep, cooking, cleaning and storage. Write down what frustrates you, and that list becomes the scope of the project.
Go through each major piece and decide whether it can stay as it is, needs a fresh finish or has to be replaced. Mark each one keep, refresh or replace, starting with your kitchen cabinets (what many homeowners call cupboards).
Cabinets with solid boxes and a layout that works can get a refreshed finish instead of a full replacement. If you are leaning that way, professional painting services in Surrey can refresh the cabinet finish.
Appliances you keep should be noted, and new ones measured before the layout is finalized.
Countertops should be decided early, both the material and the edge style, since they affect the work around them.
The sink and faucet are simplest to keep in place, because moving the sink changes plumbing.
Any move to plumbing, gas, ventilation, electrical or walls changes who has to be on site, so raise it at the first visit and it will be included in the estimate. Each change decides which trades are needed and in what order.
Cabinets, countertops, backsplash, flooring and wall colour work best when picked as one set, otherwise finishes end up mismatched.
Backsplash tile has to suit the countertop and the colour scheme, so plan the backsplash tile installation together with the counter.
Kitchens deal with spills and heavy use, so kitchen flooring installation should account for water resistance and how the floor meets the next room.
Patching and smoothing are easier before cabinets and counters go in. Wall repairs fall under drywall mudding and taping, ceiling damage under drywall and ceiling repair, and the final coats under interior painting services in Surrey.
Kitchen parts depend on each other, so settle these in order before anything is ordered. The sequence is appliances, then cabinets, then the countertop template, then the backsplash.
Appliance models and sizes come before the cabinet order, since the openings are built around them.
Cabinets go in before the countertop is measured, so the template comes from the installed cabinets, not the drawings.
The countertop template and edge are settled before the backsplash, because the tile starts at the counter.
Decide whether the flooring runs under the cabinets or stops at them, before materials are ordered.
Outlet and light positions are fixed before the walls are closed and painted.
Kitchens carry more hidden moisture risk than most rooms, from supply lines to dishwasher connections. If you find a leak or damage, fix the cause first, since new finishes will not solve a moisture problem underneath them.
In British Columbia, a hazardous materials survey is required before renovation or demolition work on applicable buildings built before 1990, so complete the survey before old flooring, ceiling texture or wall compound is removed. WorkSafeBC's asbestos and hazardous materials guidance explains the requirements, and any kitchen demolition in Surrey should wait until the survey is complete.
Plumbing, gas and electrical work is regulated, so moving the sink, range, gas line or electrical circuits usually needs a licensed plumber, gas fitter or electrician. Ask which changes also need a permit, and confirm the requirements with the City of Surrey renovation and building requirements before work starts.
Plan where you will eat and wash up before demolition, because the kitchen will be unavailable for part of the project and the water may be shut off at times. A microwave, kettle and a few essentials in another room are enough, with dishes and pantry items you will not need packed away.
Cost and timeline depend mostly on whether the layout changes, so compare your project to the three types below. Wider budgeting and layout advice for any interior renovation covers the rest of the home, not only the kitchen.
| Renovation Type | Typical Cost Range | Estimated Timeline |
|---|---|---|
| Kitchen refresh only | Varies by project | Varies by project |
| Kitchen refresh with new surfaces | Varies by project | Varies by project |
| Kitchen layout change | Varies by project | Varies by project |
A contingency budget is extra money set aside for unexpected issues found once the work starts.
A strata kitchen renovation involves extra steps beyond the work itself. Check each item below with your strata corporation, as requirements vary by building.
Condo and townhouse projects are covered under strata renovation services in Surrey.
Tick items off as you go, or print the list and take it to your first meeting with your contractor.
Appliance models and any layout changes. Cabinet openings, plumbing and electrical all depend on them, and the countertop and backsplash are measured from the cabinets afterward.
Often yes. If the cabinets are solid and the layout works for you, they can be repaired or refreshed instead of replaced. A layout change usually makes replacement more likely.
List the appliances and small devices that will plug in at the counter and mark where each one sits. Add light over the sink and work surfaces, including under-cabinet lighting, not only in the ceiling, and give your contractor the plan before the walls are closed.
Cabinets and appliances. The countertop and backsplash are measured from them, so a delay here holds up everything after.
Moving the sink, range or gas line, changing ventilation, adding electrical circuits and opening walls bring in extra trades and usually affect both the schedule and the estimate.
Tell Citified Planning & Construction Ltd. what you have decided so far. Each project starts with that scope, from general renovation and finishing services in Surrey to a full kitchen remodel.