Homeowner Checklist

Kitchen Remodel Checklist for Surrey Homes

Use this kitchen remodel checklist to settle what needs deciding before work starts, so your contractor can price the real scope of work.

Layout, appliances, surfaces and the order of work all affect each other, and a change made after materials are ordered usually costs time.

Request a Free Kitchen Remodel Estimate
Step 1

Map How You Actually Use the Kitchen

Start with how your household cooks, cleans and stores things, because that decides what the new layout has to fix. Most kitchens work in four zones: prep, cooking, cleaning and storage. Write down what frustrates you, and that list becomes the scope of the project.

Questions About Your Daily Kitchen Use

  • Where do groceries and hot pots land first, and is that spot clear?
  • Can one person empty the dishwasher while another cooks?
  • Are the garbage and recycling within reach of the prep area?
  • Where do everyday dishes, pots and pantry items live?
Step 2

Decide What Stays, What Is Refreshed and What Goes

Go through each major piece and decide whether it can stay as it is, needs a fresh finish or has to be replaced. Mark each one keep, refresh or replace, starting with your kitchen cabinets (what many homeowners call cupboards).

Kitchen Cabinets

Cabinets with solid boxes and a layout that works can get a refreshed finish instead of a full replacement. If you are leaning that way, professional painting services in Surrey can refresh the cabinet finish.

Appliances

Appliances you keep should be noted, and new ones measured before the layout is finalized.

Countertops

Countertops should be decided early, both the material and the edge style, since they affect the work around them.

Sink and Faucet

The sink and faucet are simplest to keep in place, because moving the sink changes plumbing.

Step 3

Flag Layout Changes That Add Work

Any move to plumbing, gas, ventilation, electrical or walls changes who has to be on site, so raise it at the first visit and it will be included in the estimate. Each change decides which trades are needed and in what order.

  • Plumbing: moving the sink, dishwasher or fridge water line.
  • Gas: moving the range or a gas line.
  • Ventilation: changing the range hood or its route.
  • Electrical: adding outlets, under-cabinet lighting or a new appliance circuit.
  • Structure: removing or opening up a wall.
Step 4

Choose the Surfaces Together

Cabinets, countertops, backsplash, flooring and wall colour work best when picked as one set, otherwise finishes end up mismatched.

Tiled kitchen backsplash above a countertop in a Surrey kitchen renovation

Backsplash Tile That Suits the Counter

Backsplash tile has to suit the countertop and the colour scheme, so plan the backsplash tile installation together with the counter.

Solid hardwood flooring in a kitchen with an island and countertop

Flooring That Handles Spills and Heavy Use

Kitchens deal with spills and heavy use, so kitchen flooring installation should account for water resistance and how the floor meets the next room.

Walls and Ceiling Work Comes First

Patching and smoothing are easier before cabinets and counters go in. Wall repairs fall under drywall mudding and taping, ceiling damage under drywall and ceiling repair, and the final coats under interior painting services in Surrey.

Step 5

Know What Has to Be Decided Before What

Kitchen parts depend on each other, so settle these in order before anything is ordered. The sequence is appliances, then cabinets, then the countertop template, then the backsplash.

01

Appliance Models and Sizes Come First

Appliance models and sizes come before the cabinet order, since the openings are built around them.

02

Cabinets Go In Before Measuring

Cabinets go in before the countertop is measured, so the template comes from the installed cabinets, not the drawings.

03

Countertop Template and Edge Before Backsplash

The countertop template and edge are settled before the backsplash, because the tile starts at the counter.

04

Flooring Under or Up to the Cabinets

Decide whether the flooring runs under the cabinets or stops at them, before materials are ordered.

05

Outlet and Light Positions

Outlet and light positions are fixed before the walls are closed and painted.

Step 6

Check What Is Hiding Behind the Finishes

Kitchens carry more hidden moisture risk than most rooms, from supply lines to dishwasher connections. If you find a leak or damage, fix the cause first, since new finishes will not solve a moisture problem underneath them.

Where to Check for Hidden Moisture

  • Under the sink: staining, soft wood or a musty smell.
  • Behind the backsplash: the wall and the area around the dishwasher.
  • Near the fridge and dishwasher: soft spots or lifting in the floor.
  • Below an upstairs bathroom: stains on the ceiling.

Pre-1990 Homes: Hazardous Materials Survey

In British Columbia, a hazardous materials survey is required before renovation or demolition work on applicable buildings built before 1990, so complete the survey before old flooring, ceiling texture or wall compound is removed. WorkSafeBC's asbestos and hazardous materials guidance explains the requirements, and any kitchen demolition in Surrey should wait until the survey is complete.

Step 7

Know Which Changes Need a Licensed Trade

Plumbing, gas and electrical work is regulated, so moving the sink, range, gas line or electrical circuits usually needs a licensed plumber, gas fitter or electrician. Ask which changes also need a permit, and confirm the requirements with the City of Surrey renovation and building requirements before work starts.

Step 8

Set Up a Temporary Kitchen

Plan where you will eat and wash up before demolition, because the kitchen will be unavailable for part of the project and the water may be shut off at times. A microwave, kettle and a few essentials in another room are enough, with dishes and pantry items you will not need packed away.

Budget and Schedule

Kitchen Remodel Cost and Timeline in Surrey

Cost and timeline depend mostly on whether the layout changes, so compare your project to the three types below. Wider budgeting and layout advice for any interior renovation covers the rest of the home, not only the kitchen.

Renovation TypeTypical Cost RangeEstimated Timeline
Kitchen refresh onlyVaries by projectVaries by project
Kitchen refresh with new surfacesVaries by projectVaries by project
Kitchen layout changeVaries by projectVaries by project

Plan a Contingency Budget

A contingency budget is extra money set aside for unexpected issues found once the work starts.

Strata Homes

Remodelling a Strata Kitchen in Surrey

A strata kitchen renovation involves extra steps beyond the work itself. Check each item below with your strata corporation, as requirements vary by building.

  • Strata approval: ask whether your strata corporation requires written approval for the work, and what drawings or trade details it wants to see.
  • Bylaws and work hours: check your bylaws for permitted renovation days and hours, and any noise or deposit requirements.
  • Elevator booking: ask whether the elevator must be booked or padded for deliveries and debris removal.
  • Parking and access: confirm where contractors and delivery vehicles can park and how they enter the building.
  • Strata management: share your schedule with the property manager early and name one contact for questions.

Condo and townhouse projects are covered under strata renovation services in Surrey.

Before Demolition

Printable Kitchen Remodel Checklist

Tick items off as you go, or print the list and take it to your first meeting with your contractor.

Kitchen Remodel Checklist – Citified Planning & Construction Ltd.

Plan

Choose and Order

Check and Approve

Get Ready

Frequently Asked

Kitchen Remodel FAQs

Appliance models and any layout changes. Cabinet openings, plumbing and electrical all depend on them, and the countertop and backsplash are measured from the cabinets afterward.

Often yes. If the cabinets are solid and the layout works for you, they can be repaired or refreshed instead of replaced. A layout change usually makes replacement more likely.

List the appliances and small devices that will plug in at the counter and mark where each one sits. Add light over the sink and work surfaces, including under-cabinet lighting, not only in the ceiling, and give your contractor the plan before the walls are closed.

Cabinets and appliances. The countertop and backsplash are measured from them, so a delay here holds up everything after.

Moving the sink, range or gas line, changing ventilation, adding electrical circuits and opening walls bring in extra trades and usually affect both the schedule and the estimate.