Residential Renovation Service

Home Renovation Contractor in Surrey

Citified Planning & Construction Ltd. is a home renovation contractor in Surrey that takes a space from demolition to final paint with one team. Framing, drywall, tile, flooring and painting are planned and sequenced together, so you deal with one contractor and one schedule.

Request a Free Estimate
Overview

One Team, the Right Order, No Juggling Multiple Crews

Most renovation delays come from coordinating separate contractors for each trade, waiting on one crew to finish before the next can start, or discovering the sequencing wasn't planned correctly in the first place. Citified takes on full renovation projects with one team managing demolition, framing, drywall, tile, and flooring in the right order from day one.

Because our crews cover multiple trades directly, we can sequence a renovation efficiently, catch issues between trades before they become delays, and give you a single point of contact for the entire project instead of managing several contractors yourself.

Founder Lovepreet (Preet) has worked in construction since 2015 and founded Citified in 2017. Today a crew of more than 15 people handles renovations across Surrey and the Lower Mainland.

Home renovation and finishing project by Citified Planning & Construction in Surrey
Home renovation and finishing work by Citified Planning & Construction Ltd.

What's Included in a Citified Renovation

Project Types

Home Renovations We Handle in Surrey

Most of our residential work falls into a few types of projects. Each one uses the same team and the same planned sequence.

Basement Renovations

Framing, drywall, flooring and paint to turn an unfinished or dated basement into usable living space. If moisture is a concern, it gets checked before anything is closed in.

Main Floor and Whole Home Updates

New layouts, fresh walls and ceilings, new flooring and paint across several rooms, planned so the home stays as usable as possible during the work.

Bathroom and Kitchen Finishing

Bathroom tile, kitchen backsplashes, new flooring, drywall repair and paint, so the rooms you use most feel finished and new. A kitchen remodel checklist helps settle the order of work and the budget before the project starts.

Single Room Refreshes

A bedroom, living room or office that needs damaged walls repaired, a new floor and a clean paint finish, done properly in one visit.

Planning an interior update room by room? Our interior home renovation guide walks through what each room usually involves and what affects the budget.

Our Process

How We Approach a Full Renovation

01

Scope & Plan

We walk the space, define the full scope, and plan the trade sequence before any work begins.

02

Demo & Framing

Demolition and any structural or framing changes are completed first, setting up the space for the trades that follow.

03

Drywall, Tile & Flooring

Each trade is sequenced in the right order, with our own crews moving between stages without waiting on outside contractors.

04

Paint & Final Finish

Painting and final touch-ups complete the project, followed by a full clean and walkthrough.

Why It Matters

Why Coordination Makes or Breaks a Renovation

A renovation is a chain of trades, and each one depends on the one before it. Flooring cannot go down before drywall dust is gone. Paint cannot start until tile and trim are done. When different contractors handle each stage, small delays stack up and nobody owns the gaps between them.

With one renovation contractor managing the whole job, the schedule stays in one place. We keep track of:

  • The order of work, so no trade has to undo or wait on another
  • Materials, so tile, flooring and finishes are on site when they are needed
  • Hidden issues found during demolition, which get dealt with right away instead of becoming a new quote from a new contractor
  • Protection of the parts of your home that are not being renovated
  • One point of contact for questions, changes and updates

Planning a renovation in Surrey? Tell us about the space and we will quote the full job.

Request a Free Estimate
Before You Start

Choosing a Renovation Contractor in Surrey

Whoever you hire, a few conversations up front save a lot of trouble later. Ask any renovation contractor:

  • Which trades they handle with their own crew, and which they subcontract
  • What the written scope and quote include, and what they leave out
  • How they handle changes or problems found once walls are opened
  • What the realistic timeline is, including drying and setting times
  • Whether they have photos of similar finished projects

For a full checklist, read how to choose a renovation contractor in the Lower Mainland. If you are still deciding when to start and how to budget, our guide on when to remodel and how to plan the work covers timing, permits and sequencing. You can also see our recent projects.

Renovating a strata building or a commercial space?

Strata suites, common areas, offices and tenant improvements need a different plan for access, notices and working hours. See our strata and commercial renovations page.

Service Area

Home Renovations Across the Lower Mainland

We are based in Surrey and take on home renovations throughout the Lower Mainland, including the cities below.

Surrey Langley Delta White Rock Burnaby Richmond Vancouver Coquitlam Port Coquitlam Port Moody Maple Ridge Pitt Meadows New Westminster Abbotsford
Common Questions

Home Renovation FAQs

When one team handles demolition, drywall, tile, and flooring, there's no waiting between separate contractors, no gaps in scheduling, and one point of accountability for the whole project. It also means issues discovered mid-project, like an unexpected framing problem, can be addressed immediately rather than triggering a new round of contractor coordination.

Yes, this is exactly the kind of project our team is built for, taking a space from demolition through framing, drywall, tile, flooring, and final paint under one coordinated schedule.

We plan the order upfront based on the scope, typically demolition and framing first, then drywall, then tile and flooring, with painting near the end. Because our own crews handle each stage, we can adjust the schedule quickly if something changes mid-project.

Yes, we can provide a consolidated quote covering the full scope of work, so you have one clear estimate rather than piecing together quotes from separate trades.

It depends on the size of the space and the scope. A single room refresh moves much faster than a basement or a full main floor, and drying times for drywall compound and tile setting add to the schedule. We give you a realistic timeline with the quote, once we have seen the space.

Often, yes. We can phase the work so part of the home stays usable, close off the work area, and protect floors and finished surfaces. For larger projects we discuss the best approach with you before work starts.

It depends on the scope and the city. Cosmetic work such as drywall repair, flooring and painting usually does not need one, while structural, plumbing or electrical changes usually do. We will tell you what applies to your project when we plan the scope.